Suspended fiber cement ceiling installation (Philippines)

Fiber cement boards (e.g. HardieFlex) on a suspended steel frame, with taped or sealed joints. Quantities for framing, boards, fixings, tape and sealant.

Not yet Reviewed

System20.2 m² · 1 rooms
Show lengths in
Ceiling frame seen from below: furring channels every 406 mm clip under carrying channels 1,219 mm apart, hung on rods every 1,200 mm; the frame rests on the wall angle; a row of noggings between the furring channels sits under the board ends; boards are screwed to the furring every 200 mm.406 mm200 mm1,219 mm1,200 mm123456789101112
  1. Wall angle
  2. Wall angle fastener
  3. Rod, anchored to the roof
  4. Carrying channel
  5. W-clip
  6. Furring channel
  7. Rivet at each frame end
  8. Nogging under the board ends
  9. Fiber cement board
  10. Screw, putty on the head
  11. Joint tape + compound
  12. Sealed gap at the wall

Seen from below, first two boards in place. Not to scale.

Joints: push the boards tight together and cover the seams with jointing compound. Seal the gap at the walls.

Parts at a glance

PartAmountRating
73 m lengths
36every 0.6 m and at each wall end
10every 1,200 mm
10to suit your roof framing
45 m lengths · 1,219 mm apart
28one where channels cross
66at each channel and nogging end, two per splice
145 m lengths · every 406 mm
2under every board end · every 2,438 mm
81,219 mm × 2,438 mm · 4.5 mm thick
54420 mm long · every 200 mm
19 min the gap at the walls
2300 ml cartridges
22 mpaper or fiberglass mesh
1 setask the seller how many pails
1 setover every screw head
1 setN95 / P2

Checks

0 to fix0 to check9 OK
  • 9 checks passed
    • Furring channels 406 mm apart: within the 406 mm maximum.
    • Board edges land on a furring channel in every room (at most 0 mm off, within 2 mm).
    • Carrying channels 1,219 mm apart: within the 1,219 mm maximum.
    • Hanger rods every 1,200 mm along each carrying channel: within the 1,200 mm maximum.
    • Screws every 200 mm on edges and 200 mm in the middle.
    • 20 mm screws: at least the 20 mm needed for board and channel.
    • Flush joints: boards butted tight, finished with jointing compound.
    • 1 row of board end joints, each on a row of noggings every 2,438 mm (15 pieces, in the parts list).
    • Longest room side 5.86 m, not over 6 m: no control joint needed.

These numbers are estimates. Check them against your own measurements and product labels before you build. Follow the board maker's current installation guide, and have the roof framing checked before hanging a ceiling from it.